
Click to view full size
(Kaieteur News) – Guyana remains firmly on track to produce over one million barrels of oil per day (bpd) before the end of 2026 as the fifth Floating Production Storage and Offloading vessel (FPSO), Errea Wittu is already producing close to 100,000 barrels as of Monday.
This update was provided by President of ExxonMobil Guyana Limited (EMGL), Alistair Routledge on Monday during a press conference at the company’s Ogle headquarters, East Coast Demerara.
He said, “The Uaru project with the Errea Wittu FPSO, the first one built and operated MODEC is going through its commissioning and startup operations. This will take several weeks and involves bringing online and making sure all of the rotating equipment all of the components on the vessel are operating as they should do safely, delivering the capacity, the reliability that we look forward to.”
Continues on Kaieteur News
The portable companion to gazettE. Get notifications, track read articles, and more. The latest news from Trinidad and Tobago, in one place.
Related stories
See articles related to "Guyana on track to produce over 1M barrels per day by year end - Exxon"